Tempe Equipment Rentals
Tempe sits between Phoenix and Mesa and is home to Arizona State University's main campus. Much of its equipment work happens on occupied blocks beside homes, campus buildings and busy streets, where City rules on work hours, hauling and right-of-way permits set the schedule.
Plan the permits and the delivery along with the machine. The sections below summarize what Tempe's codes and permit pages say about each.

Local Work
Tempe's construction-hour code is organized around distance from homes. Its tightest limits apply in or within 500 feet of a residential zone, start times shift with the season, and concrete pours may begin earlier than other work. Anything outside the allowed hours needs a written letter of authorization, requested at least four working days ahead, with notices delivered to every resident and business within 500 feet at least 48 hours before the work.
Getting machines and spoil in and out is regulated too. Hauling construction waste fill or excavation material on City right-of-way takes a special haul permit, and loads over 80,000 pounds, 65 feet long, 8 feet 6 inches wide or 13 feet 6 inches high need an oversize/overweight permit; both requests are due at least five working days ahead. That matters when a large excavator or loader arrives on a lowboy.
For tight infill and campus-area jobs, mini excavators, skid steers, scissor lifts and telehandlers are common picks. On larger redevelopment sites, Maricopa County's Dust Control Permit applies once 0.1 acre or more is disturbed.
Featured Equipment
Mini Excavator RentalsTrenching, potholing and utility work under Tempe's separate right-of-way permit types.
Skid Steer RentalsCleanup and spoil loading that has to follow a haul permit's route and conditions.
Scissor Lift RentalsInterior fit-outs and renovations in downtown and campus-area buildings.
Telehandler RentalsPlacing materials on multistory infill sites with little room to stage.
Concrete Equipment RentalsEarly-start pours allowed by Tempe's hour rules, plus saw cutting for pavement restoration.
Compactor & Roller RentalsTrench backfill to the Tempe Supplement to the MAG specifications.Site Rules
Local rules and conditions worth checking before equipment arrives. Requirements change and depend on the project, so confirm the details with the agency for your site.
Tempe takes separate online applications for utility permits, right-of-way trenching permits, pothole permits, encroachment permits and special use permits. Construction in the right-of-way follows the latest MAG Uniform Standard Specifications and Details, the City of Tempe Supplement and the Tempe Traffic Barricade Manual.
Tempe engineering permits are valid for one year from issuance. As-builts and an approved final inspection are due within that year or the permits expire, and extensions are available for a fee.
Tempe City Code sec. 20-8 limits outside construction and the operation of construction equipment to set hours unless the City authorizes other times in writing. Work must stop by 7 p.m. On Saturdays, Sundays and holidays it can't start before 7 a.m. (6 a.m. for concrete). Weekday start times depend on the season and on distance from residential zones, so confirm the current window with the City before scheduling an early start.
Requests to work outside the allowed hours go to Neighborhood Services at least four working days ahead. The application asks for a map of everything within 500 feet of the work zone, a description of the work (jackhammering, saw cutting, backup alarms and so on), mitigation measures and a copy of the notice that goes to every resident and business in that zone 48 hours ahead.
Barricade companies need an annual Tempe barricading permit, which requires ATSSA certification for designers, field supervisors, foremen and operations managers, before they can submit traffic control plan permit applications. Build that company's lead time into any job that needs a lane or sidewalk.
A haul permit can designate routes, haul hours or days, access points to the right-of-way and traffic control such as barricades or flaggers. The permittee is responsible for removing spilled fill or excavation material from streets and sidewalks.
Tempe's pavement management program aims to avoid cutting new or newly overlaid streets. When a cut can't be avoided, the City's fee schedule adds a surcharge for new or resurfaced pavement less than seven years old, with a higher rate under three years, and Engineering publishes a pavement cut restriction map and pavement restoration policy.
Work inside Valley Metro rail right-of-way needs an access permit request submitted by 3 p.m. Tuesday the week before, Track Access Training and attendance at the weekly Thursday Track Allocation meeting, with a new request each week. Questions about boring or excavation near Valley Metro infrastructure go to its utility group.
Arizona law requires white-lining the dig area before a locate request, and marks stay valid for 15 working days. Maricopa County requires a Dust Control Permit before disturbing 0.1 acre or more.
Nearby Cities
Guides
Rental Companies
Companies located in Tempe or with documented service there. Confirm equipment availability, rates and delivery directly with each company.
Phoenix, AZ
Tempe, AZ
FAQ
Sometimes. Concrete pours can start earlier than other work, and weekday start times depend on the season and on distance from homes. On weekends and holidays, work can't start before 7 a.m. (6 a.m. for concrete) without a letter of authorization requested at least four working days ahead.
Hauling construction waste fill or excavation material on City right-of-way takes a special haul permit. Submit the application, a route map and a certificate of insurance at least five working days before you need it.
When the load is over 80,000 pounds, 65 feet long, 8 feet 6 inches wide or 13 feet 6 inches high, or has a front or rear extension. Requests are due at least five working days ahead.
One year from issuance. As-builts and an approved final inspection are due within that year, or the permit expires.