Arapahoe Rental - Fort Collins
Fort Collins, CO
- Excavators
- Skid Steers
- Trenchers
- Telehandlers
- Boom Lifts
- Scissor Lifts
- Forklifts
- Generators
- Compactors & Rollers
- Concrete Equipment
Fort Collins Equipment Rentals
Fort Collins, home to Colorado State University, puts several everyday parts of an equipment job under City rules. A dumpster or pallet of material set in the street needs a permit, any cut or bore in City right-of-way needs another, and construction debris such as concrete, metal and clean wood has to be recycled.
Those rules affect what you rent and how you stage it. Here is what the City's engineering and code compliance pages require before machines arrive.

Local Work
New public infrastructure starts with a Development Construction Permit. Building or modifying water or sewer mains, public streets, sidewalks or drainage facilities requires one, and grading and utility work can't begin until it's issued. Smaller jobs in existing streets run on Engineering's right-of-way permits instead, and the contractor doing the cutting needs a City Right-of-Way Contractor's License for that category of work.
Dust gets as much attention as digging. Construction dust must stay on the property, sites larger than five acres keep a Dust Prevention and Control Plan on site, and crews are expected to stop work when wind exceeds 30 miles per hour. That favors planning water, covered hauling and stockpile locations along with the excavator or loader.
Disposal planning matters too. Concrete and aggregates, metal, untreated wood and cardboard from construction and demolition are on the City's required-recycling list, so demolition and site-clearing jobs may need to pair a skid steer or loader with separate containers for each material.
Featured Equipment
Mini Excavator RentalsService work and short street cuts under an Engineering excavation permit.
Skid Steer RentalsSorting concrete, metal and clean wood into separate piles for required recycling.
Excavator RentalsGrading and utility work that starts once a Development Construction Permit is issued.
Wheel Loader RentalsManaging stockpiles that have to sit well back from property lines on larger sites.
Compactor & Roller RentalsBackfill and subgrade for public streets and sidewalks built to City standards.
Trencher RentalsUtility runs on development sites, coordinated with 811 positive response before digging.Site Rules
Local rules and conditions worth checking before equipment arrives. Requirements change and depend on the project, so confirm the details with the agency for your site.
Fort Collins requires an Engineering Excavation Permit any time cutting is done in City right-of-way, including sidewalks, boring and street cuts. Applications include a site plan, and the contractor must hold a valid City Right-of-Way Contractor's License for that work category. Sidewalk and driveway approach work has its own permit with the same license requirement.
Storing equipment or material, or doing any work, in public right-of-way needs a permit. An Encroachment Permit covers obstructions such as dumpsters, storage units and landscaping material, and a separate Stockpiling Permit allows temporary storage of suitable fill for future construction use.
A Development Construction Permit is required before any work that builds or modifies public infrastructure: water or sewer mains, public streets or sidewalks, and public drainage facilities. Grading and utility work can't begin until it's issued, and projects with public infrastructure need Engineering inspections.
Vehicles exceeding legal size or weight limits on City streets, including large equipment loads, need an Oversized Vehicle Permit from Engineering.
Construction noise is allowed from 7 a.m. to 8 p.m. unless a variance is granted. Complaints go to Code Compliance, which also has an environmental inspector focused on construction sites, waste and air quality.
Dust from construction or landscaping must not leave the property, and sites larger than five acres must keep a Dust Prevention and Control Plan on site. Required measures include covering trucks hauling dirt or debris, reducing speeds on unpaved roads, minimizing excavator bucket drop height, stopping work when wind exceeds 30 mph, restricting site access and keeping stockpiles back from property lines by ten times the pile height.
Construction and demolition debris, including aggregates and concrete, metal, untreated wood and cardboard, is on the City's required-recycling list. Trucks over 14,000 pounds may not idle for more than five minutes.
Colorado law requires a locate request at least two business days, not counting the day of notice, before excavation or demolition, and Colorado 811 advises allowing three full business days. Premark the dig area with white paint, flags or stakes, have each excavating company get its own ticket, and check for positive response before digging. Private lines aren't located through 811.
Nearby Cities
Guides
Rental Companies
Companies located in Fort Collins or with documented service there. Confirm equipment availability, rates and delivery directly with each company.
Fort Collins, CO
Fort Collins, CO
Fort Collins, CO
Fort Collins, CO
FAQ
Yes. Dumpsters, storage units and landscaping material placed in City right-of-way need an Encroachment Permit from Engineering, with a site plan, map or sketch showing the location.
A contractor with a valid City Right-of-Way Contractor's License for that category of work, under an Engineering Excavation Permit. That covers sidewalk cuts, boring and street cuts.
Construction noise is allowed from 7 a.m. to 8 p.m. unless the City grants a variance.
Aggregates and concrete, metal, untreated wood and cardboard from construction and demolition are on the City's required-recycling list, so plan separate loads or containers for them.
Browse equipment categories to find the right machine for your project.